Articles by category: Press

Press

2019 Project Update 

2019 Project Update 
in Press, Project Updates

The Estimated Cost to Completion remains $3.1M. To date we are about 1/3 the way through the funding with donations and pledges received. The committee has made the decision to break the project into two phases:

Phase 1:  Landscaping, compass rose fabrication and installation, bronze plaques (and cast Globe & Anchor seal for center of compass rose) and Stone Benches (fabrication & installation), full engineering drawings of support structure and fabricated glass wings.

Read more...

Wings of Honor Project receives $500,000 pledge from the Santa Ynez Band of Chumash Indians

Wings of Honor Project receives $500,000 pledge  from the Santa Ynez Band of Chumash Indians
in Press

The Wings of Honor Project, which aims to build a monument at Santa Barbara International Airport to commemorate the site’s history as a US Marine Corps Air Station (MCAS) during World War II, announced the start of its public fundraising campaign at 10 a.m. on Monday, August 1 inside the old 1942 Terminal at the airport.

Read more...
Print Friendly and PDF